Successful ecologisation of block 6 in Počerady

Aeras in konsorcium with Mostecká montážní a.s. and in collaboration with Steinmüller Engineering GmbH delivered Tray layer in FGD for B6 in Počerady Power Plant. Thanks to this technology the guaranteed dust emissions < 8 mg/Nm³ (6%O2, dry) have been achieved with a significant margin with very reasonable CAPEX.